Task 1 free, then €79Intermediate3.5 h of studyChina · Unit-price contract priced from a bill of quantities under GB/T 50500-2024
Bill-of-quantities pricing in practice: GB/T 50500-2024 (China)
A course for cost engineers: five tasks, on an invented county school classroom block.

People in this case
YouThe contractor's cost engineer
County education bureauclient, pays
Supervising engineerChecks quantities and progress
The project and people are invented for training. The rules and contract forms are real.
Tasks
A task as it opens in the trainer, before you enter anything.

- 1
- 2
- 3
- 4
- 5Quantity deviation over 15 %PaidFoundation≈45 minChangeTheory · 11 minCheat sheet: every rule on one page
Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.
You will be able to
Skills checked
- Build the composite unit rate of a bill item from quota consumption and VAT-exclusive prices
- Price measured works and measures, including the safety and civilised construction fee
- Set up statutory fees and VAT as ERP markups on the right bases
- Prepare an interim payment with the advance recovered at the contract pace
- Reprice items after a quantity deviation over 15 %: the limit quantity and the two prices
Videos on this method
Certificate
Awarded when all 5 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.
The certificate is included in the price.

Files you work with
Created in your OpenConstructionERP workspace the moment you enrol.
- parties3 records
- Estimatebill of quantities11 lines
- Billingcontract
- Billingprogress records10 lines
Prices
€79one paymentPrice when sales open
Task 1 is free. Pay only if you want to go on. Start task 1 free
- All 5 tasks and the professional certificate
- No subscription, nothing renews
- No VAT added: the price is the total
Course not as described? We fix it or refund you.
Need a discount? Write to info@datadrivenconstruction.io
How pricing worksWhat next
Questions about this course? Write to info@datadrivenconstruction.io
Related courses

Your roleThe contractor's quantity surveyor
Rebar takeoff and bar bending schedule (UAE, BS 8666)
As the contractor's quantity surveyor you read a beam detail and work out the cut length of each bar by its BS 8666 shape code, measure a slab with laps, cover and mesh sheets.
Intermediate3.5 h of studyFigures checked 24EN
Task 1 free, then €79Professional certificate

Your roleSenior Quantity Surveyor
Interim payment and retention (UAE, FIDIC)
A community centre built under the FIDIC Red Book 2017.
Intermediate2.5 h of studyFigures checked 20EN
Tasks 1–2 free, then €59Professional certificate
Your roleThe contractor's estimator (Kalkulant)Estimating under ÖNORM B 2061: K3, K7 and a claim for extra costs
About three and a half hours.
Intermediate3 h of studyFigures checked 15DE
Task 1 free, then €79Professional certificate