Εισαγωγή στο μάθημα · 3 λ.

Ανάλυση τιμών κατά την πρακτική του CPWD (Ινδία)

You are the estimating engineer for a district council: you prepare the detailed estimate, the priced list of all work, for a primary health centre before it goes to tender. In four tasks you build the rates for brickwork and reinforced concrete (RCC) from analysis sheets, the method of India's Central Public Works Department (CPWD), then price the whole estimate.

Έναρξη εργασίας 1

A single-storey health centre in grey block with bamboo scaffolding on red earth, a concrete mixer, cement bags and a stack of blocks in front, two workers in orange vests walking by.Φανταστικό έργο
Kesarwadi Primary Health CentreVillage health centre · walls and frame rising
Building
Single-storey primary health centre in a village
Contract
Public works contract, priced from the schedule of rates (the government's published rates) with a station cost index, the percentage for this location
Currency
Rupees, worked before GST
Εργασία στο ERP
4 εργασίες, περίπου 2 ώ. 20 λ.

Ποιος δίνει τι σε ποιον

Every arrow is a document that reaches your desk or leaves it, and the task where that happens.

Έρχεται σε εσάς

  • Site engineerSends the analysis sheets
    • Brickwork analysis sheet and two brick offersΕργασία 1
    • RCC M25 sheet and bar bending scheduleΕργασία 3
  • Two contractorsQuote line 2.1 their own way
    • Quote A and quote BΕργασία 2
ΕσείςEstimating engineer, detailed estimate

Φεύγει από εσάς

    • Brickwork rate per m³Εργασία 1
    • Complete rate and the gap to quote AΕργασία 2
    • RCC rate and the reinforcement lineΕργασία 3
    • Estimate totalΕργασία 4
    Executive EngineerChecks your rates

Η διαδρομή σας στο έργο

Three tasks to build a rate, one to price the estimate. Brickwork comes first because the two later steps reuse its logic. Start with task 1: in the Bill of Quantities you cost 10 m³ of brickwork from the cheaper brick source.

  1. Analyse the work

    Εργασία 1 · 35 λ.

    Πλινθοδομή: η φθηνότερη πηγή, μετά το κόστος ανά m3

    Παράγετε
    Cost of 10 m³ of brickwork from the cheaper brick source
    Έγγραφο
    Analysis sheet and two brick offers
    Στο ERP
    Bill of Quantities
  2. Analyse the work

    Εργασία 2 · 30 λ.

    Δύο προσφορές εργολάβων έναντι της τιμής CPWD

    Παράγετε
    The CPWD rate on line 2.1, and how far quote A sits below it
    Έγγραφο
    Two contractor quotes
    Στο ERP
    Bill of Quantities
  3. Concrete and the estimate

    Εργασία 3 · 40 λ.

    RCC M25: τι περιλαμβάνεται στην τιμή σκυροδέματος

    Παράγετε
    RCC M25 rate on line 2.2, reinforcement kept on line 1.3
    Έγγραφο
    RCC sheet and bar bending schedule (the list of every steel bar)
    Στο ERP
    Bill of Quantities
  4. Concrete and the estimate

    Εργασία 4 · 35 λ.

    Είδη τιμολογίου με δείκτη κόστους, αναλυμένα είδη χωρίς

    Παράγετε
    The estimate total, Direct Cost
    Έγγραφο
    Schedule base rates and the station cost index
    Στο ERP
    Bill of Quantities

From an analysis sheet to an estimate

A rate is built in layers, and each layer has one place to go. Task 4 shows which rates take the cost index and which do not.

Mason, beldar, bhistiCarriage to siteMaterials
Εργασία 1What the work consumesPer 10 m³: materials, carriage from the source to site, and labour at the day rates of the schedule. The cheaper source counts delivered, not at the gate.
Profit and overheadsWater chargesMason, beldar, bhistiCarriage to siteMaterials
Εργασία 2Water, then profit and overheadsWater charges go on the cost first. The percentage for profit and overheads then goes on that sum, not on labour alone and not in one step.
Bars, paid on line 1.3Labour and mixerCement, sand, aggregate
Εργασία 3What belongs in the concrete rateThe sheet lists the bars, but line 1.3 already pays reinforcement by weight. Leave them in the rate and they are paid twice.
Analysed items, no indexCost indexSchedule base rates
Εργασία 4Index on schedule items onlySchedule items take base rate plus the station cost index. Rates analysed from market rates are already at site prices and take none.

Με μπλε ό,τι προσθέτει η εργασία· με γκρι ό,τι έρχεται από πριν.

Με λίγα λόγια. Price the cheaper source delivered. Water first, then profit and overheads on the sum. Pay steel once. Index the schedule, not the analysis.