Nároky a prodloužení lhůty (Saúdská Arábie, FIDIC)
You manage claims for the builder of a three-storey clinic in Saudi Arabia. A claim is a formal request for more time or more money when something outside your control delays the job, such as drawings arriving late. In five tasks, under the FIDIC Red Book 2017 contract, you take two delays from the site diary to a fully detailed Claim: find when the notice clock started, test the Notices, find which delay moves Completion and price it.
Smyšlený projekt- Building
- Outpatient clinic for a private healthcare company
- Contract
- FIDIC Red Book 2017, the international standard contract, with Particular Conditions
- Money
- Saudi riyal, valued before VAT
- Práce v ERP
- Úlohy: 5, asi 1 h 55 min
Kdo komu co předává
Every arrow is a document that reaches your desk or leaves it, and the task where that happens.
Přichází k vám
- Site EngineerYour firm, keeps the diary
- Diary: roof slab crew idleÚloha 1
- Diary: rock in the drainage trenchÚloha 2
- Project ManagerYour firm, programme and costs
- The remaining programmeÚloha 3
- Cost recordsÚloha 4
Odchází od vás
- Notices of ClaimÚloha 2
- Extension of time and its basisÚloha 3
- Cost Plus Profit for NOC-02Úloha 4
- The fully detailed ClaimÚloha 5
Vaše cesta zakázkou
Two tasks get the Notices right, two find the time and the money, one sends the fully detailed Claim before its limit. Start with task 1: you read the site diaries to fix the date the builder became aware of the delay.
Notices
Úloha 1 · 20 min
Kdy začal běžet čas? Zjištění a 28 dnů
- Výstup
- The awareness date, and whether NOC-02 was in time
- Dokument
- Daily diaries around the roof slab stoppage
- V ERP
- Daily Diary
Notices
Úloha 2 · 20 min
Oznámení o nároku a opožděné Oznámení
- Výstup
- Both Notices registered, and whether the late one stands
- Dokument
- The Engineer's notice that NOC-01 was late
- V ERP
- Variations
Time and money
Úloha 3 · 30 min
Které zdržení posune Dokončení? Kritická cesta
- Výstup
- The critical path and the delay that moves Completion
- Dokument
- The remaining programme and both delays
- V ERP
- 4D Schedule
Time and money
Úloha 4 · 30 min
Náklady plus zisk za pozdní výkresy
- Výstup
- Cost Plus Profit (cost, plus a profit margin) for the late drawings, before VAT
- Dokument
- Cost records: overheads, idle crew, formwork hire
- V ERP
- Variations
Claim
Úloha 5 · 15 min
Plně podložený claim: 84 dnů
- Výstup
- NOC-02 submitted as a fully detailed Claim
- Dokument
- The claim file and the awareness date
- V ERP
- Variations
Four tests a claim must pass
Each bar is one test, in the order of the tasks. Task 5 then puts what passed into the fully detailed Claim before the last time limit.
Modře je to, co úloha přidává; šedě to, co se přenáší z dřívějška.
Stručně. Date awareness from the records, notify inside the period, claim time only for delay on the critical path, and add Profit only where the clause gives it.