Сургалтын танилцуулга · 3 мин
Концепцийн шатны элементийн зардлын төлөвлөгөө (Их Британи, RICS NRM 1)
You are the cost consultant for the client, an NHS Trust, building a new health centre in England. At the start there are only sketches, but the client must know what the building will cost before it commits. In five tasks you turn the concept design into a cost limit, test a cheaper frame and outer walls, and report the result against the client's budget.
Зохиомол төсөл- Building
- Three storeys, atrium and an enclosed roof plant room
- Rules
- RICS NRM 1, the UK rules for early cost estimates and cost plans
- Story
- Concept design, November 2026 to January 2027
- ERP дээрх ажил
- Даалгавар: 5, ойролцоогоор 3 цаг 20 мин
Хэн хэнд юу дамжуулдаг
Nothing is built yet. Everything that passes between you and the others is a drawing, a figure or a letter.
Танд ирдэг
ArchitectLeads the design team- Concept drawingsДаалгавар 1
- Option B: steel frame, rendered wallsДаалгавар 4
- Budget letterFrom the Trust's board
- Total project budget, VAT inДаалгавар 5
ТаCost consultant, working for the clientТанаас гардаг
- Order of cost estimateДаалгавар 1
- Cost plan 1 and the cost limitДаалгавар 3
- Saving from option BДаалгавар 4
- Cost plan 2 against the budgetДаалгавар 5
The health trustClient, sets the budget
Төсөл ба хүмүүс зохиомол. Хөрөг зургууд үүсгэгдсэн.
Төслөөр явах таны зам
One task from a single rate, two to build the first cost plan, two to change it and report. Start with task 1: in the Bill of Quantities you measure the floor area (GIFA) and multiply it by a rate from similar buildings.
Order of cost
Даалгавар 1 · 40 мин
GIFA ба зардлын эрэмбийн тооцоо
- Үр дүн
- Floor area (GIFA, measured inside the outer walls) and the first estimate
- Баримт бичиг
- Concept drawings, a benchmark rate and price indices
- ERP дээр
- Bill of Quantities
Cost plan 1
Даалгавар 2 · 50 мин
Элементийн зардлын төлөвлөгөө
- Үр дүн
- Elements 1 to 8 (frame, roof, walls and so on) and the cost check per m²
- Баримт бичиг
- Element unit quantities and rates
- ERP дээр
- Bill of Quantities, Cost Breakdown
Cost plan 1
Даалгавар 3 · 40 мин
Барилгын ажлаас зардлын хязгаар хүртэл
- Үр дүн
- The cost limit at the tender date
- Баримт бичиг
- Allowances and the inflation forecast
- ERP дээр
- Bill of Quantities, Markups
Cost plan 2
Даалгавар 4 · 40 мин
Үнэ цэнийн инженерчлэл: ган каркас ба шохойн ханын өнгөлгөө
- Үр дүн
- The saving from option B, after the redesign fee
- Баримт бичиг
- Option B rates from the design team
- ERP дээр
- Bill of Quantities
Cost plan 2
Даалгавар 5 · 30 мин
Зардлын төлөвлөгөө 2-ыг төсөвтэй тулгах
- Үр дүн
- The variance to budget and the cost per m²
- Баримт бичиг
- The Trust's budget letter
- ERP дээр
- Bill of Quantities, Cost Breakdown
How a floor area becomes a cost limit
Each column is one task. The grey part is carried from the task before, the coloured part is what that task adds.
Цэнхэр нь даалгаврын нэмж буй хэсэг; саарал нь өмнөх алхмаас ирсэн хэсэг.
Товчхондоо. Measure GIFA inside the walls. Price each element on its own measure. Add the percentage rows in NRM 1 order, each once. Compare like with like.