Elementenbegroting in de conceptfase (UK, RICS NRM 1)
You are the cost consultant for the client, an NHS Trust, building a new health centre in England. At the start there are only sketches, but the client must know what the building will cost before it commits. In five tasks you turn the concept design into a cost limit, test a cheaper frame and outer walls, and report the result against the client's budget.
Fictief project- Building
- Three storeys, atrium and an enclosed roof plant room
- Rules
- RICS NRM 1, the UK rules for early cost estimates and cost plans
- Story
- Concept design, November 2026 to January 2027
- Werk in de ERP
- 5 opdrachten, ongeveer 3 u 20 min
Wie geeft wat aan wie
Nothing is built yet. Everything that passes between you and the others is a drawing, a figure or a letter.
Komt bij u
ArchitectLeads the design team- Concept drawingsOpdracht 1
- Option B: steel frame, rendered wallsOpdracht 4
- Budget letterFrom the Trust's board
- Total project budget, VAT inOpdracht 5
UCost consultant, working for the clientGaat van u uit
- Order of cost estimateOpdracht 1
- Cost plan 1 and the cost limitOpdracht 3
- Saving from option BOpdracht 4
- Cost plan 2 against the budgetOpdracht 5
The health trustClient, sets the budget
Het project en de mensen zijn fictief. De portretten zijn gegenereerd.
Uw route door het project
One task from a single rate, two to build the first cost plan, two to change it and report. Start with task 1: in the Bill of Quantities you measure the floor area (GIFA) and multiply it by a rate from similar buildings.
Order of cost
Opdracht 1 · 40 min
GIFA en de globale kostenraming
- U levert
- Floor area (GIFA, measured inside the outer walls) and the first estimate
- Document
- Concept drawings, a benchmark rate and price indices
- In de ERP
- Bill of Quantities
Cost plan 1
Opdracht 2 · 50 min
Het elementenkostenplan
- U levert
- Elements 1 to 8 (frame, roof, walls and so on) and the cost check per m²
- Document
- Element unit quantities and rates
- In de ERP
- Bill of Quantities, Cost Breakdown
Cost plan 1
Opdracht 3 · 40 min
Van bouwwerkzaamheden naar het kostenplafond
- U levert
- The cost limit at the tender date
- Document
- Allowances and the inflation forecast
- In de ERP
- Bill of Quantities, Markups
Cost plan 2
Opdracht 4 · 40 min
Value engineering: staalconstructie en gepleisterde wanden
- U levert
- The saving from option B, after the redesign fee
- Document
- Option B rates from the design team
- In de ERP
- Bill of Quantities
Cost plan 2
Opdracht 5 · 30 min
Kostenplan 2 aansluiten op het budget
- U levert
- The variance to budget and the cost per m²
- Document
- The Trust's budget letter
- In de ERP
- Bill of Quantities, Cost Breakdown
How a floor area becomes a cost limit
Each column is one task. The grey part is carried from the task before, the coloured part is what that task adds.
Blauw is wat de opdracht toevoegt; grijs komt uit de stap ervoor.
Kort gezegd. Measure GIFA inside the walls. Price each element on its own measure. Add the percentage rows in NRM 1 order, each once. Compare like with like.