Inleiding tot de cursus · 3 min
Grondverzet: afgraving- en ophogingsvolumes, massadiagram en prijsberekening (Canada)
Marlow Heights Phase 1 · Two new subdivision streets, Ontario · Fictief project
You are the estimator for the earthworks contractor on two new streets in Ontario. Earthworks means digging soil out where the road is too high (cut) and building it up where it is too low (fill). In five tasks you measure cut and fill, convert soil between its loose and packed states, read a mass haul diagram, build a hauling rate from machine cycles and price a change for poor ground.
- Work
- Cut, fill, borrow (soil brought in) and haul for two streets
- Contract
- Municipal unit-price contract, items in the OPSS style (Ontario standard specifications)
- Story
- Tender in October 2026 to a change in June 2027
- Werk in de ERP
- 5 opdrachten, ongeveer 3 u 15 min
Wie geeft wat aan wie
Every arrow is a document that reaches your desk or leaves it, and the task where that happens.
Komt bij u
- The Town's engineerIssues sections, checks quantities
- Cross-sections of Heron DriveOpdracht 1
- Mass ordinates of Marlow AvenueOpdracht 3
- Order: silt out, Granular B inOpdracht 5
- Site superintendentRuns the machines and trucks
- Excavator, trucks and cycle timesOpdracht 4
Gaat van u uit
- Cut and fill quantitiesOpdracht 1
- Borrow and waste quantitiesOpdracht 2
- Overhaul and surplusOpdracht 3
- Rate for haul to wasteOpdracht 4
- Change for unsuitable siltOpdracht 5
Uw route door het project
Three tasks to get the quantities right, one to price a line that has no rate, one to price a change once the ground is open. Start with task 1: in the Bill of Quantities you work out cut and fill from ten cross-sections.
Quantities
Opdracht 1 · 35 min
Ontgraving en aanvulling met de gemiddelde profielenmethode
- U levert
- Cut and fill volumes, items 02.01 and 02.02
- Document
- Ten cross-sections of Heron Drive
- In de ERP
- Bill of Quantities
Quantities
Opdracht 2 · 35 min
Zelling, krimp en vrachtwagenladingen
- U levert
- Borrow to bring in, and truck loads to take away
- Document
- Soil factors and the engineer's note on wet clay
- In de ERP
- Bill of Quantities
Quantities
Opdracht 3 · 40 min
Massalijn, vrije transportafstand en overtransport
- U levert
- Overhaul (hauling beyond the free distance) and surplus, items 03.01 and 03.02
- Document
- Mass ordinates of Marlow Avenue
- In de ERP
- Bill of Quantities
Rate
Opdracht 4 · 45 min
Materieelproductiviteit naar eenheidsprijs
- U levert
- The unit rate for haul to waste
- Document
- Machine costs, fuel and cycle times
- In de ERP
- Bill of Quantities
Change
Opdracht 5 · 40 min
Ongeschikt materiaal: een te prijzen wijziging
- U levert
- The priced change for unsuitable silt
- Document
- Test pit sections and agreed rates
- In de ERP
- Variations
How a cross-section becomes a price
Each column is the bill after one task. Grey is what it already holds; blue is what that task adds.
Blauw is wat de opdracht toevoegt; grijs komt uit de stap ervoor.
Kort gezegd. Measure in bank m³. Convert only to compare or to haul. The slower machine sets the output. Price a change at the agreed rates, HST outside.