Курсқа кіріспе · 3 мин

IS 1200 бойынша өлшеу және шот қою (Үндістан)

You are the billing engineer of the contractor building a teaching block for a central institute: you measure the work done and bill for it. In five tasks you measure one brick wall by the Indian standard IS 1200, price the bill at schedule rates, the government's published rates, raise the first running account (RA) bill, the monthly part payment, and work out what the institute actually pays after deductions.

1-тапсырманы бастау

The RCC frame of a three-storey teaching block with bamboo scaffolding and green safety net, workers on the floor slabs, two women carrying head pans of mortar, and heaps of sand and aggregate in front.Ойдан шығарылған жоба
Academic Block B, Sonapada InstituteRCC frame up, brickwork and plaster under way
Building
Ground plus two storey teaching block of a central institute
Contract
CPWD General Conditions of Contract 2023; bidders quote one percentage above or below the schedule of rates
Currency
Rupees, tendered rates inclusive of GST
ERP-дегі жұмыс
Тапсырмалар: 5, шамамен 2 сағ 45 мин

Кім кімге не береді

Every arrow is a document that reaches your desk or leaves it, and the task where that happens.

Сізге келеді

  • Project ManagerYour firm, your side
    • Wall CW1 and its opening sizes1-тапсырма
    • The tender percentage the company quoted3-тапсырма
  • Engineer-in-ChargeInstitute Engineering Wing
    • Cost index notified for the station3-тапсырма
    • RA Bill 1, passed for payment5-тапсырма
СізBilling engineer, your firm

Сізден кетеді

    • Brickwork measured to IS 12001-тапсырма
    • Plaster measured to IS 12002-тапсырма
    • RA Bill 1 and what is left to bill4-тапсырма
    Engineer-in-ChargeChecks measurements and bills
    • Recoveries and the amount payable5-тапсырма
    Accounts officerInstitute, pays the bill

Жоба бойынша жолыңыз

Two tasks measure, two price and bill, one gets the money in. Start with task 1: in the Bill of Quantities you measure the brickwork volume of wall CW1 for line 2.3.

  1. Measure the wall

    1-тапсырма · 35 мин

    Кірпіш қалауды өлшеу: қай ашулар шегеріледі

    Нәтиже
    Brickwork volume of wall CW1 on line 2.3
    Құжат
    Elevation of CW1 with seven openings
    ERP-де
    Bill of Quantities
  2. Measure the wall

    2-тапсырма · 35 мин

    Сол қабырғадағы сылақ: бір емес, үш шек

    Нәтиже
    Plaster area of the same wall on line 3.1
    Құжат
    The same elevation, plaster on both faces
    ERP-де
    Bill of Quantities
  3. Price and bill

    3-тапсырма · 35 мин

    Сметаны бағалау: негізгі бағалар, құн индексі, тендерлік пайыз

    Нәтиже
    Gross value of the abstract (the priced summary of all lines)
    Құжат
    Schedule base rates and the station cost index
    ERP-де
    Bill of Quantities
  4. Price and bill

    4-тапсырма · 30 мин

    ERP-дегі 1-ағымдағы есепшот

    Нәтиже
    RA Bill 1 (the first part payment) in five lines, the share billed and the balance
    Құжат
    Contract: tendered amount and Schedule 'F'
    ERP-де
    Contracts
  5. Get paid

    5-тапсырма · 30 мин

    Шегерімдер: ұстап қалу, әлеуметтік алым, GST

    Нәтиже
    The amount the institute pays
    Құжат
    Passed RA Bill 1 and the tax position
    ERP-де
    Contracts

From one wall to one payment

Each task adds one layer to the same money. The new layer is in colour; what it sits on is grey.

Brickwork, m³
1-тапсырмаBrickwork by volumeOne face of the wall less the openings over 0.1 m², times the thickness, less the concrete (RCC) lintels over the openings.
Plaster, m²Brickwork, m³
2-тапсырмаPlaster by areaBoth faces, openings deducted by size band, reveals added only for the largest.
Tender %Cost indexAbstract at base rates
3-тапсырмаBase rates, then two additionsSchedule base rates on every line. The station cost index, the percentage for this location, on the base total; the tender percentage on the indexed total.
Gross of RA Bill 1
4-тапсырмаThe same money as a billFive lines in the claim. The gross is measured against the tendered amount, not the estimate.
Cess, GST TDSSecurity depositPaid to the contractor
5-тапсырмаWhat reaches the bankSecurity deposit off the gross. The labour welfare cess and the GST tax deducted at source (TDS) come off the value without GST.

Көкпен — тапсырма қосатын бөлік; сұрмен — алдыңғы қадамнан келгені.

Қысқаша. Brick and plaster have different thresholds. Index first, tender percentage on top. Bill against the tendered amount. Deposit on the gross, cess and tax at source on the value without GST.