OpenConstruction Academy
Кирүү / Катталуу
KY

Курска киришүү · 3 мүн

IS 1200 боюнча өлчөө жана эсеп коюу (Индия)

You are the billing engineer of the contractor building a teaching block for a central institute: you measure the work done and bill for it. In five tasks you measure one brick wall by the Indian standard IS 1200, price the bill at schedule rates, the government's published rates, raise the first running account (RA) bill, the monthly part payment, and work out what the institute actually pays after deductions.

1-тапшырманы баштоо

The RCC frame of a three-storey teaching block with bamboo scaffolding and green safety net, workers on the floor slabs, two women carrying head pans of mortar, and heaps of sand and aggregate in front.Ойдон чыгарылган долбоор
Academic Block B, Sonapada InstituteRCC frame up, brickwork and plaster under way
Building
Ground plus two storey teaching block of a central institute
Contract
CPWD General Conditions of Contract 2023; bidders quote one percentage above or below the schedule of rates
Currency
Rupees, tendered rates inclusive of GST
ERPдеги иш
Тапшырмалар: 5, болжол менен 2 саат 45 мүн

Ким кимге эмне берет

Every arrow is a document that reaches your desk or leaves it, and the task where that happens.

Сизге келет

  • Project ManagerYour firm, your side
    • Wall CW1 and its opening sizes1-тапшырма
    • The tender percentage the company quoted3-тапшырма
  • Engineer-in-ChargeInstitute Engineering Wing
    • Cost index notified for the station3-тапшырма
    • RA Bill 1, passed for payment5-тапшырма
СизBilling engineer, your firm

Сизден кетет

    • Brickwork measured to IS 12001-тапшырма
    • Plaster measured to IS 12002-тапшырма
    • RA Bill 1 and what is left to bill4-тапшырма
    Engineer-in-ChargeChecks measurements and bills
    • Recoveries and the amount payable5-тапшырма
    Accounts officerInstitute, pays the bill

Долбоор боюнча жолуңуз

Two tasks measure, two price and bill, one gets the money in. Start with task 1: in the Bill of Quantities you measure the brickwork volume of wall CW1 for line 2.3.

  1. Measure the wall

    1-тапшырма · 35 мүн

    Кыш дубалды өлчөө: кайсы ачылыштар кемитилет

    Натыйжа
    Brickwork volume of wall CW1 on line 2.3
    Документ
    Elevation of CW1 with seven openings
    ERPде
    Bill of Quantities
  2. Measure the wall

    2-тапшырма · 35 мүн

    Ошол эле дубалдагы шыбак: бир эмес, үч босого

    Натыйжа
    Plaster area of the same wall on line 3.1
    Документ
    The same elevation, plaster on both faces
    ERPде
    Bill of Quantities
  3. Price and bill

    3-тапшырма · 35 мүн

    Сметаны баалоо: негизги баалар, чыгым индекси, тендер пайызы

    Натыйжа
    Gross value of the abstract (the priced summary of all lines)
    Документ
    Schedule base rates and the station cost index
    ERPде
    Bill of Quantities
  4. Price and bill

    4-тапшырма · 30 мүн

    ERP'деги 1-аралык эсеп-акы

    Натыйжа
    RA Bill 1 (the first part payment) in five lines, the share billed and the balance
    Документ
    Contract: tendered amount and Schedule 'F'
    ERPде
    Contracts
  5. Get paid

    5-тапшырма · 30 мүн

    Кармап калуулар: кепилдик депозити, социалдык жыйым, GST

    Натыйжа
    The amount the institute pays
    Документ
    Passed RA Bill 1 and the tax position
    ERPде
    Contracts

From one wall to one payment

Each task adds one layer to the same money. The new layer is in colour; what it sits on is grey.

Brickwork, m³
1-тапшырмаBrickwork by volumeOne face of the wall less the openings over 0.1 m², times the thickness, less the concrete (RCC) lintels over the openings.
Plaster, m²Brickwork, m³
2-тапшырмаPlaster by areaBoth faces, openings deducted by size band, reveals added only for the largest.
Tender %Cost indexAbstract at base rates
3-тапшырмаBase rates, then two additionsSchedule base rates on every line. The station cost index, the percentage for this location, on the base total; the tender percentage on the indexed total.
Gross of RA Bill 1
4-тапшырмаThe same money as a billFive lines in the claim. The gross is measured against the tendered amount, not the estimate.
Cess, GST TDSSecurity depositPaid to the contractor
5-тапшырмаWhat reaches the bankSecurity deposit off the gross. The labour welfare cess and the GST tax deducted at source (TDS) come off the value without GST.

Көк менен — тапшырма кошкон бөлүк; боз менен — мурунку кадамдан келгени.

Кыскача. Brick and plaster have different thresholds. Index first, tender percentage on top. Bill against the tendered amount. Deposit on the gross, cess and tax at source on the value without GST.