Úvod do kurzu · 3 min
Výkaz výztuže a výkaz ohýbané výztuže (SAE, BS 8666)
You are the builder's quantity surveyor on a five-storey block of flats in the UAE: you measure the work and price it. This course is about rebar, the steel bars inside the concrete. In five tasks you take the bars from the beam and slab drawings to a priced package in the bill, then value the drawing revision that changes the bar sizes.
Smyšlený projekt- Building
- Ground plus four floors, concrete frame, flat slabs
- Contract
- FIDIC Red Book 2017 (international standard contract), with a bill of quantities, in AED
- Story
- March 2026 (Revision B) to June 2026 (Revision C)
- Práce v ERP
- Úlohy: 5, asi 3 h 40 min
Kdo komu co předává
Every arrow is a document that reaches your desk or leaves it, and the task where that happens.
Přichází k vám
EngineerIssues drawings and instructions- Beam B7 detail, Rev BÚloha 1
- Slab S3 detail, Rev BÚloha 2
- Instruction EI 07, Rev CÚloha 5
Steel supplierQuotes and delivers the steel- Quotation per tonneÚloha 4
VyQuantity surveyor, main contractorOdchází od vás
- Measured bill linesÚloha 1
- Package priceÚloha 4
- Variation orderÚloha 5
- Order quantity, waste inÚloha 3
Projekt i lidé jsou smyšlení. Portréty jsou vygenerované.
Vaše cesta zakázkou
Two tasks measure, one weighs, one prices, one values a change. Start with task 1: in the Bill of Quantities you work out the total length of each bar in beam B7.
Measure
Úloha 1 · 45 min
Trám B7: pruty podle kódu tvaru
- Výstup
- Total length of each beam bar mark (each bar type on the drawing)
- Dokument
- Beam B7 detail, Revision B
- V ERP
- Bill of Quantities
Measure
Úloha 2 · 45 min
Deska S3: pruty, přesahy a sítě
- Výstup
- Slab bars with laps (overlaps at joints), and mesh sheets
- Dokument
- Slab S3 detail, Revision B
- V ERP
- Bill of Quantities
Weigh
Úloha 3 · 40 min
Hmotnosti, tonáž a objednávka
- Výstup
- Net tonnes by bar size, and the order
- Dokument
- Mass per metre, element counts
- V ERP
- Bill of Quantities
Price
Úloha 4 · 40 min
Ocenění balíčku výztuže
- Výstup
- A rate per net tonne, and the package price
- Dokument
- Supplier quotation and labour rates
- V ERP
- Bill of Quantities, Markups
Change
Úloha 5 · 50 min
Revize C: nové zaměření změny
- Výstup
- The variation (priced change) for the new bar sizes
- Dokument
- Engineer's instruction EI 07, Revision C
- V ERP
- Variations
How a drawing becomes a price
Each step below is one task, in the order the steel moves. Task 3 sits between the slab and the price: it turns metres into net tonnes, and keeps the waste for the order.
Modře je to, co úloha přidává; šedě to, co se přenáší z dřívějška.
Stručně. Measure the bar that is bent, not the box around it. Bill net tonnes. Put the waste in the order and the supply price, the markup in one row.