Арматурын тооцоо ба нугалах хуваарь (АНЭУ, BS 8666)
You are the builder's quantity surveyor on a five-storey block of flats in the UAE: you measure the work and price it. This course is about rebar, the steel bars inside the concrete. In five tasks you take the bars from the beam and slab drawings to a priced package in the bill, then value the drawing revision that changes the bar sizes.
Зохиомол төсөл- Building
- Ground plus four floors, concrete frame, flat slabs
- Contract
- FIDIC Red Book 2017 (international standard contract), with a bill of quantities, in AED
- Story
- March 2026 (Revision B) to June 2026 (Revision C)
- ERP дээрх ажил
- Даалгавар: 5, ойролцоогоор 3 цаг 40 мин
Хэн хэнд юу дамжуулдаг
Every arrow is a document that reaches your desk or leaves it, and the task where that happens.
Танд ирдэг
EngineerIssues drawings and instructions- Beam B7 detail, Rev BДаалгавар 1
- Slab S3 detail, Rev BДаалгавар 2
- Instruction EI 07, Rev CДаалгавар 5
Steel supplierQuotes and delivers the steel- Quotation per tonneДаалгавар 4
ТаQuantity surveyor, main contractorТанаас гардаг
- Measured bill linesДаалгавар 1
- Package priceДаалгавар 4
- Variation orderДаалгавар 5
- Order quantity, waste inДаалгавар 3
Төсөл ба хүмүүс зохиомол. Хөрөг зургууд үүсгэгдсэн.
Төслөөр явах таны зам
Two tasks measure, one weighs, one prices, one values a change. Start with task 1: in the Bill of Quantities you work out the total length of each bar in beam B7.
Measure
Даалгавар 1 · 45 мин
B7 дам нуруу: хэлбэрийн кодоор бар
- Үр дүн
- Total length of each beam bar mark (each bar type on the drawing)
- Баримт бичиг
- Beam B7 detail, Revision B
- ERP дээр
- Bill of Quantities
Measure
Даалгавар 2 · 45 мин
S3 хавтан: бар, давхцал ба торон хуудас
- Үр дүн
- Slab bars with laps (overlaps at joints), and mesh sheets
- Баримт бичиг
- Slab S3 detail, Revision B
- ERP дээр
- Bill of Quantities
Weigh
Даалгавар 3 · 40 мин
Жин, тонн ба захиалга
- Үр дүн
- Net tonnes by bar size, and the order
- Баримт бичиг
- Mass per metre, element counts
- ERP дээр
- Bill of Quantities
Price
Даалгавар 4 · 40 мин
Арматурын багцыг үнэл
- Үр дүн
- A rate per net tonne, and the package price
- Баримт бичиг
- Supplier quotation and labour rates
- ERP дээр
- Bill of Quantities, Markups
Change
Даалгавар 5 · 50 мин
Revision C: өөрчлөлтийг дахин хэмж
- Үр дүн
- The variation (priced change) for the new bar sizes
- Баримт бичиг
- Engineer's instruction EI 07, Revision C
- ERP дээр
- Variations
How a drawing becomes a price
Each step below is one task, in the order the steel moves. Task 3 sits between the slab and the price: it turns metres into net tonnes, and keeps the waste for the order.
Цэнхэр нь даалгаврын нэмж буй хэсэг; саарал нь өмнөх алхмаас ирсэн хэсэг.
Товчхондоо. Measure the bar that is bent, not the box around it. Bill net tonnes. Put the waste in the order and the supply price, the markup in one row.