You are the builder's quantity surveyor on a five-storey block of flats in the UAE: you measure the work and price it. This course is about rebar, the steel bars inside the concrete. In five tasks you take the bars from the beam and slab drawings to a priced package in the bill, then value the drawing revision that changes the bar sizes.

Start opdracht 1

A reinforced concrete residential frame under construction, with beam and slab reinforcement being fixed on the first floor.Fictief project
Khor Sama ResidenceGround-plus-four residential block, UAE
Building
Ground plus four floors, concrete frame, flat slabs
Contract
FIDIC Red Book 2017 (international standard contract), with a bill of quantities, in AED
Story
March 2026 (Revision B) to June 2026 (Revision C)
Werk in de ERP
5 opdrachten, ongeveer 3 u 40 min

Wie geeft wat aan wie

Every arrow is a document that reaches your desk or leaves it, and the task where that happens.

Komt bij u

  • EngineerIssues drawings and instructions
    • Beam B7 detail, Rev BOpdracht 1
    • Slab S3 detail, Rev BOpdracht 2
    • Instruction EI 07, Rev COpdracht 5
  • Steel supplierQuotes and delivers the steel
    • Quotation per tonneOpdracht 4
UQuantity surveyor, main contractor

Gaat van u uit

    • Measured bill linesOpdracht 1
    • Package priceOpdracht 4
    • Variation orderOpdracht 5
    EmployerPrivate developer
    • Order quantity, waste inOpdracht 3
    Your site teamPlaces the steel order

Het project en de mensen zijn fictief. De portretten zijn gegenereerd.

Uw route door het project

Two tasks measure, one weighs, one prices, one values a change. Start with task 1: in the Bill of Quantities you work out the total length of each bar in beam B7.

  1. Measure

    Opdracht 1 · 45 min

    Balk B7: staven volgens vormcode

    U levert
    Total length of each beam bar mark (each bar type on the drawing)
    Document
    Beam B7 detail, Revision B
    In de ERP
    Bill of Quantities
  2. Measure

    Opdracht 2 · 45 min

    Vloer S3: staven, overlappen en netten

    U levert
    Slab bars with laps (overlaps at joints), and mesh sheets
    Document
    Slab S3 detail, Revision B
    In de ERP
    Bill of Quantities
  3. Weigh

    Opdracht 3 · 40 min

    Gewichten, tonnage en de bestelling

    U levert
    Net tonnes by bar size, and the order
    Document
    Mass per metre, element counts
    In de ERP
    Bill of Quantities
  4. Price

    Opdracht 4 · 40 min

    Prijs het wapeningspakket

    U levert
    A rate per net tonne, and the package price
    Document
    Supplier quotation and labour rates
    In de ERP
    Bill of Quantities, Markups
  5. Change

    Opdracht 5 · 50 min

    Revisie C: herbereken de wijziging

    U levert
    The variation (priced change) for the new bar sizes
    Document
    Engineer's instruction EI 07, Revision C
    In de ERP
    Variations

How a drawing becomes a price

Each step below is one task, in the order the steel moves. Task 3 sits between the slab and the price: it turns metres into net tonnes, and keeps the waste for the order.

Beam bars and links, in metres
Opdracht 1Cut lengthOutside dimensions, less what the bends take back, times the number of bars.
Slab bars and meshBeams
Opdracht 2Slab steelBars counted by spaces rounded up, plus one, a lap at each joint, mesh laid out sheet by sheet.
Overhead and profitNet tonnes at their rates
Opdracht 4Package priceNet tonnes times a rate built from supply, waste, cutting and fixing. One markup row on top.
Revision CPackage price
Opdracht 5VariationNew sizes go in, old sizes come out, both at the bill rates.

Blauw is wat de opdracht toevoegt; grijs komt uit de stap ervoor.

Kort gezegd. Measure the bar that is bent, not the box around it. Bill net tonnes. Put the waste in the order and the supply price, the markup in one row.