Courses
Courses in the free OpenConstructionERP. Each task is done in the ERP on a fictional project, and every answer is checked against a worked solution.
Learning paths
Pick the job you do or want to do. Its courses are in the order the work happens, free ones first.
Estimator
- Quantity takeoff from PDF, DWG and IFC (UK, NRM2)Free2.5 h of study
- Resource-based estimate to tender (UK)Free2 h of study
- Subcontract tender: record, level and award (UK)Free1.5 h of study
- Procurement: compare quotes and buy steel (UK)Free1.5 h of study
- 13Your countryProfessional
- Multifamily takeoff to schedule of values (US)Professional3 h of study
- Tenant improvement bid: office fit-out (US)Professional2.5 h of study
- Office fit-out: measure, price and budget with GST (India)Free1 h of study
- Bid leveling: drywall subcontractor bids (US)Free1 h of study
- Complete a GAEB X83 bill of quantities (Germany)Professional2 h of study
- Unit-price budget (Mexico)Professional2 h of study
- AI-priced estimates: check the rates before you bidProfessional3.5 h of study
- AI bill checks: verify the findings, then fix the billProfessional3 h of study
- Earthworks: cut and fill, mass haul and pricing (Canada)Professional3.5 h of study
- MEP estimating: electrical and HVAC takeoff and bid (US)Professional3.5 h of study
- Home renovation: estimate, quote and variations (Australia)Professional3 h of study
- Tender estimate: from net rates to the tender sumFree1 h of study
- Price, win and vary a FIDIC contractFree1.5 h of study
- Quantity takeoff from PDF, DWG and IFCFree1.5 h of study
- Unit rate build-up: labour, materials, plant, variationFree1.5 h of study
32 courses · 21 free
Show these 32 coursesQuantity surveyor
- Tender to first valuation (UK, JCT)Free2 h of study
- Interim payment assessment (UK, NEC4 Option B)Free2 h of study
- Compensation events (UK, NEC4 ECC)Free2 h of study
- Cost control: EVM and CVR at month 6 (UK, NEC4)Free2.5 h of study
- WIP schedule: percent complete and over/under billing (US)Professional2 h of study
- CPM schedule and time extensions (US, AIA A201)Professional3 h of study
- Earned value: is the GMP still safe? (US)Professional1.5 h of study
- AI-generated programme, verified (Brazil)Professional3.5 h of study
- Risk register, EMV and contingency (UK, ISO 31000)Free2 h of study
- Upfront carbon A1-A5 (UK)Free2 h of study
- AI-assisted take-off: verify before you priceFree3 h of study
- 4Your countryProfessional
- Cash flow forecast: S-curve and retention (UK)Professional3 h of study
- Delay and claims (UK, NEC4)Professional2.5 h of study
- Final account (UK, NEC4 Option B)Professional1.5 h of study
- Road earthworks: cut, fill, haul and rate (Saudi Arabia)Free1.5 h of study
- Claims and extension of time (Saudi Arabia, FIDIC)Professional2 h of study
- AI-drafted progress claims, verified (France)Professional3.5 h of study
- Getting paid as a subcontractor (UK, Construction Act)Free1.5 h of study
- Elemental cost planning at concept stage (UK, RICS NRM 1)Professional3.5 h of study
- Rebar takeoff and bar bending schedule (UAE, BS 8666)Professional3.5 h of study
- Interim payment under FIDIC: retention, IPC, late paymentFree1.5 h of study
- Cost control at month 6: earned value and CVRFree1.5 h of study
26 courses · 11 free
Show these 26 coursesSite & project manager
- Site diary and daily reports (UK)Free2 h of study
- Site health and safety (UK, CDM 2015)Free2 h of study
- Quality inspections to closeout (UK)Free2 h of study
- Hold points and non-conformance reports (UK)Free1.5 h of study
- Programme and critical path (UK)Professional2.5 h of study
- Form 12 acts, site log, inspection and NCRs (Bulgaria)Free2 h of study
- New-build acts under ZUT and Ordinance 3 (Bulgaria)Free2 h of study
- Handover, commissioning and warranties (Bulgaria)Free2 h of study
- Measurement, variations and final account (Germany, VOB/B)Professional2 h of study
- Hindrance claims: notice to penalty (Germany, VOB/B)Professional1.5 h of study
- Site diary and daily reports as contract recordsFree1.5 h of study
- Site safety: risk, permits, incidents and LTIFRFree1.5 h of study
- Sand stockpile: survey, tonnes and the ticketsFree1 h of study
- Site levels: platform, cut and fill, building cornersFree2 h of study
14 courses · 11 free
Show these 14 coursesBIM & data
- BIM coordination and clash detection (UK, ISO 19650)Free2 h of study
- IDS 1.0 and BCF 3.0: check model data and manage issuesProfessional2.5 h of study
- IFC 4.3 quantity takeoff: from model to billProfessional3 h of study
- Estimate data ETL: import, clean and reconcile cost dataProfessional3.5 h of study
- Handover: O&M, asset data and defects (UK)Free2 h of study
- Document control in a CDE (UK)Free1 h of study
- Design management (UK)Free1 h of study
7 courses · 4 free
Show these 7 coursesAI in estimating
- AI-assisted take-off: verify before you priceFree3 h of study
- AI-priced estimates: check the rates before you bidProfessional3.5 h of study
- AI bill checks: verify the findings, then fix the billProfessional3 h of study
- AI-drafted progress claims, verified (France)Professional3.5 h of study
- AI-generated programme, verified (Brazil)Professional3.5 h of study
5 courses · 1 free
Show these 5 coursesClient & design side
- Cost calculation to DIN 276 (Germany)Professional2.5 h of study
- Public procurement and contract modification (Bulgaria, ZOP)Professional2 h of study
- Client-side risk and funding approval (UK, NEC4)Professional1.5 h of study
- Developer cost check: can we pay the asking price? (UAE)Professional1.5 h of study
- Investor's cost estimate: unit prices to award (Poland)Free1.5 h of study
5 courses · 1 free
Show these 5 coursesFree courses 52
Complete courses for one country each, from estimate to the first payment and change. Certificate of completion: €9 once, or free if you write about the course.

Your roleMain contractor's QS
Tender to first valuation (UK, JCT)
You are the main contractor's QS on a four-storey shell-and-core office let under JCT SBC/Q 2024.
Foundation2 h of studyFigures checked 28EN
All 5 tasks freeCertificate of completion

Your roleEstimator
Commercial fit-out: bid to first change order (US)
You are the estimator and project manager at a general contractor, and a tenant is fitting out three floors of an existing office building.
Foundation2 h of studyFigures checked 33EN
All 5 tasks freeCertificate of completion

Your roleEstimator
Bill of quantities to first variation order (Germany, VOB)
About four hours.
Foundation2 h of studyFigures checked 30DE
All 5 tasks freeCertificate of completion

Your roleEstimator (pricing engineer)
Price study to change order (France)
Free course, about 4 h. You are a construction cost consultant, the person who prices the work, at a structural works contractor.
Foundation2.5 h of studyFigures checked 28FR
All 5 tasks freeCertificate of completion

Your roleQuantity surveyor
Bill of quantities to variation order (Italy)
You are the quantity surveyor at a building contractor, the person who measures and prices the work.
Foundation2 h of studyFigures checked 21IT
All 5 tasks freeCertificate of completion

Your roleEstimating and bids technician
From BC3 budget to a new rate for unpriced work (Spain)
Free course, about 3.5 h. You work at a mid-sized contractor: first as the estimator, the person who works out the prices of a tender, and then as site manager.
Foundation2 h of studyFigures checked 26ES
All 5 tasks freeCertificate of completion

Your roleContractor's estimator
From cost estimate to contract addendum (Poland)
Free course, about 4 h. You are the estimator at a contractor bidding in a municipal tender to extend a kindergarten.
Foundation2.5 h of studyFigures checked 23PL
All 5 tasks freeCertificate of completion

Your roleInvestor's cost estimator for a gmina
Investor's cost estimate: unit prices to award (Poland)
On an invented village hall retrofit in a Polish gmina.
Intermediate1.5 h of studyFigures checked 11EN
All 5 tasks freeCertificate of completion

Your roleQuantity surveyor at the design consultant (road earthworks)
Road earthworks: cut, fill, haul and rate (Saudi Arabia)
On an invented link road for a Saudi municipality.
Intermediate1.5 h of studyFigures checked 9EN
All 5 tasks freeCertificate of completion

Your roleFit-out estimator at the tenant's project management consultant (office interiors)
Office fit-out: measure, price and budget with GST (India)
You are the fit-out estimator at the tenant's project management consultant.
Intermediate1 h of studyFigures checked 8EN
All 4 tasks freeCertificate of completion

Your roleGeneral contractor's estimator
Bid leveling: drywall subcontractor bids (US)
Bid a California public school as the general contractor's estimator: record a phoned sub bid as quoted, plug a scope gap, award the leveled low against the machine's rank.
Intermediate1 h of studyFigures checked 9EN
All 4 tasks freeCertificate of completion

Your roleEstimator / quantity surveyor
Quantity takeoff from PDF, DWG and IFC (UK, NRM2)
Quantity takeoff for a two-storey health centre from PDF, DWG and IFC, measured to NRM2-style rules and priced from the cost database.
Foundation2.5 h of studyFigures checked 31EN
All 6 tasks freeCertificate of completion

Your roleEstimator
Resource-based estimate to tender (UK)
Price a community health centre's bill of quantities: resource-based concrete rates, cost data brought to the tender date with an index, NRM1-ordered preliminaries and overheads and profit.
Intermediate2 h of studyFigures checked 13EN
All 6 tasks freeCertificate of completion

Your roleEstimator / buyer
Subcontract tender: record, level and award (UK)
Record, check, open, level and award a three-bid masonry subcontract tender for a health centre: arithmetic errors, a blank mandatory line, a priced exclusion and a budget carried from the estimate.
Intermediate1.5 h of studyFigures checked 10EN
All 4 tasks freeCertificate of completion

Your roleMain contractor's buyer (procurement QS)
Procurement: compare quotes and buy steel (UK)
Buy the first-floor slab steel for a health centre as the main contractor's buyer: compare three quotes on landed cost, raise and issue the purchase order with the right VAT, record a short delivery.
Intermediate1.5 h of studyFigures checked 10EN
All 5 tasks freeCertificate of completion

Your roleContractor's commercial manager (quantity surveyor)
Compensation events (UK, NEC4 ECC)
Quote, assess and implement compensation events under NEC4 ECC Option B on a health centre build: a Scope change priced with bill rates, a physical condition priced as Defined Cost plus Fee.
Advanced2 h of studyFigures checked 11EN
All 4 tasks freeCertificate of completion

Your roleSustainability / cost consultant preparing an upfront carbon estimate
Upfront carbon A1-A5 (UK)
Estimate the upfront carbon A1-A5 of a new health centre's frame, slabs and walls, and use it to decide: which wall swap cuts carbon per m², which nearer supplier cuts transport most.
Intermediate2 h of studyFigures checked 18EN
All 5 tasks freeCertificate of completion

Your roleContractor's commercial manager
Cost control: EVM and CVR at month 6 (UK, NEC4)
Report a health centre build's month 6 cost position: a cost budget from the NEC4 Prices, planned value from the cost-loaded programme, earned value from site measurement, actual cost with accruals.
Advanced2.5 h of studyFigures checked 14EN
All 5 tasks freeCertificate of completion

Your roleContractor's commercial manager
Risk register, EMV and contingency (UK, ISO 31000)
Run the Contractor's risk register for a health centre new build in ISO 31000 terms: allocate risks by owner under NEC4, score likelihood and consequence on a 5 x 5 scheme, quantify EMV.
Intermediate2 h of studyFigures checked 15EN
All 5 tasks freeCertificate of completion

Your roleContractor's quality manager and handover lead
Quality inspections to closeout (UK)
Run quality and handover on a health centre job: an inspection and test plan with hold points for the EW1 cavity, a nonconformance report priced from the window schedule.
Intermediate2 h of studyFigures checked 13EN
All 5 tasks freeCertificate of completion

Your roleContractor's site manager keeping the site diary
Site diary and daily reports (UK)
Keep the site diary of a health centre build through the February 2027 groundworks: labour and plant returns and the cause of standing plant.
Foundation2 h of studyFigures checked 13EN
All 5 tasks freeCertificate of completion

Your rolePrincipal contractor's site manager and H&S lead
Site health and safety (UK, CDM 2015)
Run health and safety on a health centre site as principal contractor: CDM 2015 duty holders, F10 notification and the construction phase plan, safety observations scored severity x likelihood.
Foundation2 h of studyFigures checked 15EN
All 5 tasks freeCertificate of completion

Your roleSubcontractor's quantity surveyor (masonry package)
Getting paid as a subcontractor (UK, Construction Act)
Work as the masonry subcontractor's quantity surveyor on a health centre and get paid under the Construction Act: a short payment with no notice, a pay less notice one day late.
Intermediate1.5 h of studyFigures checked 10EN
All 5 tasks freeCertificate of completion

Your roleContractor's commercial manager (quantity surveyor)
Interim payment assessment (UK, NEC4 Option B)
Price an NEC4 Option B assessment on a health centre new build: the Y(UK)2 and Construction Act timetable, the Price for Work Done to Date with X16 retention, pay less notices and VAT.
Intermediate2 h of studyFigures checked 14EN
All 4 tasks freeCertificate of completion

Your roleContractor's BIM coordinator (information manager)
BIM coordination and clash detection (UK, ISO 19650)
Coordinate a health centre's design models the ISO 19650 way: choose what goes into the federated model, set clash runs from the BEP clash matrix, triage hard and clearance clashes and duplicates.
Intermediate2 h of studyFigures checked 12EN
All 4 tasks freeCertificate of completion

Your roleMain contractor's document controller
Document control in a CDE (UK)
Work as the main contractor's document controller on a new health centre: find steel cut from drawings not authorised for construction, publish and issue the construction revision.
Intermediate1 h of studyFigures checked 8EN
All 4 tasks freeCertificate of completion

Your roleMain contractor's design manager
Design management (UK)
Keep the design ahead of the first-floor slab of a health centre as the main contractor's design manager: raise the RFI for riser pipes the structure has no opening for.
Intermediate1 h of studyFigures checked 5EN
All 4 tasks freeCertificate of completion

Your roleContractor's quality manager
Hold points and non-conformance reports (UK)
Work as the contractor's quality manager on a health centre build after the first-floor slab was poured before its reinforcement hold point was released: record the failed inspection.
Intermediate1.5 h of studyFigures checked 6EN
All 5 tasks freeCertificate of completion

Your roleContractor's handover lead and information manager
Handover: O&M, asset data and defects (UK)
Hand over a new health centre: assemble the O&M manuals and asset information package, check the COBie asset data against the client's AIR before the PIM to AIM transfer.
Advanced2 h of studyFigures checked 14EN
All 5 tasks freeCertificate of completion

Measure to IS 1200 and bill it (India)
A teaching block for a central institute, built under the CPWD General Conditions of Contract 2023 on a percentage rate tender.
Foundation3 h of studyFigures checked 20EN
All 5 tasks freeCertificate of completion

Your roleJunior estimator
Quantity bill and КСС (Bulgaria)
A school being renovated so that it uses less energy.
Foundation2 h of studyFigures checked 23BG
All 5 tasks freeCertificate of completion

Your rolePricing Engineer
KSS, Form 19 act and unforeseen works (Bulgaria)
A municipality renovates a school so that it uses less energy, and picks a builder through a public tender under the ЗОП (the Public Procurement Act).
Intermediate2 h of studyFigures checked 22BG
All 6 tasks freeCertificate of completion

Your roleSite Manager
Form 12 acts, site log, inspection and NCRs (Bulgaria)
The energy renovation of a municipal school.
Intermediate2 h of studyFigures checked 12BG
All 5 tasks freeCertificate of completion

Your roleProject manager
Handover, commissioning and warranties (Bulgaria)
You are the project manager at a construction firm.
Intermediate2 h of studyFigures checked 17BG
All 5 tasks freeCertificate of completion

Your roleSite Manager
New-build acts under ZUT and Ordinance 3 (Bulgaria)
A new school gym for a municipal school, a category III building under the ЗУТ (the Spatial Development Act).
Intermediate2 h of studyFigures checked 9BG
All 4 tasks freeCertificate of completion

Your roleCost estimator
SINAPI budget, social charges and BDI (Brazil)
A municipality in São Paulo state will tender a primary health clinic under Law 14.133/2021, and you prepare the reference budget, the price the municipality uses as its ceiling.
Intermediate2.5 h of studyFigures checked 21PT
All 5 tasks freeCertificate of completion

Your roleQuantity surveyor
AI-assisted take-off: verify before you price
An AI take-off draft has been loaded into the bill; you verify it against the drawing in the ERP's PDF takeoff.
Intermediate3 h of studyFigures checked 14EN
All 5 tasks freeCertificate of completion

Rate analysis to CPWD practice (India)
The detailed estimate of a primary health centre, priced the way the CPWD (Central Public Works Department) does it.
Foundation2.5 h of studyFigures checked 15EN
All 4 tasks freeCertificate of completion

Takeoff, progress payments and price adjustment (Turkey)
A free introductory course: five tasks, about three hours.
Foundation3 h of studyFigures checked 13TR
All 5 tasks freeCertificate of completion
Your roleSite managerSite diary and daily reports as contract records
On a fictional six-storey mixed-use building under a FIDIC Red Book contract.
Foundation1.5 h of studyFigures checked 12EN
All 5 tasks freeCertificate of completion

Your roleContractor's quantity surveyor
Interim payment under FIDIC: retention, IPC, late payment
On a fictional six-storey mixed-use building in its eleventh month.
Intermediate1.5 h of studyFigures checked 11EN
All 5 tasks freeCertificate of completion
Your roleEstimatorTender estimate: from net rates to the tender sum
On a fictional six-storey mixed-use building.
Foundation1 h of studyFigures checked 10EN
All 5 tasks freeCertificate of completion

Your roleContractor's quantity surveyor
Price, win and vary a FIDIC contract
Take one building from tender to its first variation under the FIDIC Red Book 2017: price the last blank lines, build the tender sum, level and award the drywall.
Foundation1.5 h of studyFigures checked 21EN
All 5 tasks freeCertificate of completion
Your roleQuantity surveyor at the client's cost consultantQuantity takeoff from PDF, DWG and IFC
On an invented six-storey mixed-use building.
Foundation1.5 h of studyFigures checked 13EN
All 5 tasks freeCertificate of completion
Your roleMain contractor's estimatorUnit rate build-up: labour, materials, plant, variation
On a fictional six-storey mixed-use building under the FIDIC Red Book.
Foundation1.5 h of studyFigures checked 13EN
All 5 tasks freeCertificate of completion
Your roleHealth and safety leadSite safety: risk, permits, incidents and LTIFR
On a fictional six-storey mixed-use building under a FIDIC Red Book contract.
Foundation1.5 h of studyFigures checked 11EN
All 5 tasks freeCertificate of completion
Your roleSite managerHandover: O&M data, defects and retention release
On a fictional six-storey mixed-use building under a FIDIC Red Book contract.
Advanced1.5 h of studyFigures checked 12EN
All 5 tasks freeCertificate of completion
Your roleQuality manager of the main contractorQuality control: hold point, NCR, RFI to taking-over
On a fictional six-storey mixed-use building under a FIDIC Red Book contract.
Intermediate1.5 h of studyFigures checked 9EN
All 5 tasks freeCertificate of completion
Your roleSite surveyor (stockpile survey and material reconciliation)Sand stockpile: survey, tonnes and the tickets
On a fictional development plot.
Intermediate1 h of studyFigures checked 8EN
All 4 tasks freeCertificate of completion
Your roleLand surveyor on the development plotSite levels: platform, cut and fill, building corners
On a fictional 2.4 ha development plot.
Intermediate2 h of studyFigures checked 16EN
All 5 tasks freeCertificate of completion
Your roleSite surveyorLand parcels: boundary, area, overlap, split and register
On a fictional development plot of about 2.4 ha.
Intermediate2 h of studyFigures checked 10EN
All 5 tasks freeCertificate of completion
Your roleContractor's quantity surveyorCost control at month 6: earned value and CVR
On a fictional six-storey mixed-use building under a FIDIC Red Book contract.
Advanced1.5 h of studyFigures checked 13EN
All 5 tasks freeCertificate of completion
Professional programme 36
Real projects in several countries, each with a professional certificate. Every course starts with free tasks, and one payment opens the rest.
Estimate and buy 18

Your roleEstimator
Multifamily takeoff to schedule of values (US)
You are an estimator, the person who works out what a building will cost before the contractor bids.
Foundation3 h of studyFigures checked 31EN
Tasks 1–2 free, then €79Professional certificate

Your roleEstimator
Tenant improvement bid: office fit-out (US)
On an invented job: fitting out one office floor of 18,000 square feet for a law firm that rents it (a tenant improvement).
Foundation2.5 h of studyFigures checked 19EN
Tasks 1–2 free, then €59Professional certificate

Your roleCost and budget analyst
Unit-price budget (Mexico)
A municipal community centre paid for with federal funds.
Intermediate2 h of studyFigures checked 22ES
Task 1 free, then €59Professional certificate

Your roleProject Architect
Cost calculation to DIN 276 (Germany)
You are the project architect for a new office building of a public utility association, at design stage (work stage 3).
Intermediate2.5 h of studyFigures checked 20DE
Task 1 free, then €59Professional certificate

Your roleEstimator
Complete a GAEB X83 bill of quantities (Germany)
You are the estimator at a facade contractor bidding for the external thermal insulation system of an office building.
Intermediate2 h of studyFigures checked 22DE
Task 1 free, then €39Professional certificate

Your roleMember of the municipality's public procurement committee
Public procurement and contract modification (Bulgaria, ZOP)
The municipality picks a builder for the energy renovation of a school through an open competition, a kind of public tender under the ЗОП (the Public Procurement Act).
Intermediate2 h of studyFigures checked 12BG
Task 1 free, then €59Professional certificate

Your roleBIM coordinator / quantity surveyor
IFC 4.3 quantity takeoff: from model to bill
Read what the file declares (schema, units, storeys), group elements by type, take Qto_ base quantities (NetSideArea, NetArea, NetVolume, NetFloorArea, NetPerimeter), find a duplicated wall.
Intermediate3 h of studyFigures checked 16EN
Task 1 free, then €79Professional certificate

Your roleCost data analyst
Estimate data ETL: import, clean and reconcile cost data
Load a subcontractor's CSV export with German number formats, read the importer's warnings, remove a duplicate row and reconcile to the offer total.
Intermediate3.5 h of studyFigures checked 19EN
Tasks 1–2 free, then €79Professional certificate

Your roleCost engineer
AI-priced estimates: check the rates before you bid
An AI estimating assistant priced the client's bill of quantities and reported a source for every line.
Intermediate3.5 h of studyFigures checked 21EN
Task 1 free, then €79Professional certificate

Your roleKalkulator
AI bill checks: verify the findings, then fix the bill
A bill-checking AI tool reported seven findings on the draft bill of quantities, and the bid goes out on Friday.
Intermediate3 h of studyFigures checked 19EN
Task 1 free, then €79Professional certificate
Your roleThe contractor's estimator (Kalkulant)Estimating under ÖNORM B 2061: K3, K7 and a claim for extra costs
About three and a half hours.
Intermediate3 h of studyFigures checked 15DE
Task 1 free, then €79Professional certificate

Your roleThe contractor's cost engineer
Bill-of-quantities pricing in practice: GB/T 50500-2024 (China)
A course for cost engineers: five tasks, on an invented county school classroom block.
Intermediate3.5 h of studyFigures checked 13ZH
Task 1 free, then €79Professional certificate
- Your roleThe contractor's estimator
Earthworks: cut and fill, mass haul and pricing (Canada)
The earthworks of a subdivision under a municipal unit-price contract.
Intermediate3.5 h of studyFigures checked 12EN
Task 1 free, then €59Professional certificate
- Your roleEstimator
MEP estimating: electrical and HVAC takeoff and bid (US)
A two-storey outpatient building in Texas.
Intermediate3.5 h of studyFigures checked 18EN
Tasks 1–2 free, then €79Professional certificate

Your roleThe client's cost consultant
Elemental cost planning at concept stage (UK, RICS NRM 1)
A course for client-side cost consultants: five tasks, on an invented three-storey health centre in England.
Intermediate3.5 h of studyFigures checked 13EN
Task 1 free, then €79Professional certificate
- Your roleThe builder
Home renovation: estimate, quote and variations (Australia)
Five tasks, on an invented renovation of a house: a kitchen, a bathroom and a rear room.
Intermediate3 h of studyFigures checked 22EN
Task 1 free, then €79Professional certificate

Your roleThe contractor's quantity surveyor
Rebar takeoff and bar bending schedule (UAE, BS 8666)
As the contractor's quantity surveyor you read a beam detail and work out the cut length of each bar by its BS 8666 shape code, measure a slab with laps, cover and mesh sheets.
Intermediate3.5 h of studyFigures checked 24EN
Task 1 free, then €79Professional certificate

Your roleDevelopment cost manager at the developer (Dubai residential tower)
Developer cost check: can we pay the asking price? (UAE)
On an invented Dubai plot: a ground-plus-twelve residential tower the developer may buy.
Advanced1.5 h of studyFigures checked 13EN
Task 1 free, then €39Professional certificate
Contract and commercial control 14

Your roleSite manager and billing
Measurement, variations and final account (Germany, VOB/B)
You are the site manager at the façade firm that built the external thermal insulation system of an office building, and now you bill the work under VOB/B.
Intermediate2 h of studyFigures checked 20DE
Task 1 free, then €39Professional certificate

Your roleSite manager (Bauleiter) of the shell contractor
Hindrance claims: notice to penalty (Germany, VOB/B)
On an invented German job: the shell of a fire station under a VOB/B contract with a town.
Intermediate1.5 h of studyFigures checked 8EN
Task 1 free, then €39Professional certificate

Your roleContractor's commercial manager (quantity surveyor)
Delay and claims (UK, NEC4)
Run the NEC4 claims cycle on a health centre build: early warnings and the register, compensation event notification and the eight-week time bar, time impact on the Accepted Programme.
Advanced2.5 h of studyFigures checked 14EN
Task 1 free, then €59Professional certificate

Your roleContractor's commercial manager
Cash flow forecast: S-curve and retention (UK)
Forecast the contractor's cash on a health centre job: a cost S-curve from the cost-loaded programme, cash out under the supply chain terms.
Advanced3 h of studyFigures checked 21EN
Tasks 1–2 free, then €59Professional certificate

Your roleSenior Quantity Surveyor
Interim payment and retention (UAE, FIDIC)
A community centre built under the FIDIC Red Book 2017.
Intermediate2.5 h of studyFigures checked 20EN
Tasks 1–2 free, then €59Professional certificate

Your roleCommercial manager
Final account (UK, NEC4 Option B)
Settle the NEC4 Option B final account of a health centre as the contractor's commercial manager: what the register says is agreed, the Project Manager's own assessment of a disputed event.
Advanced1.5 h of studyFigures checked 13EN
Task 1 free, then €39Professional certificate

Your roleProject Manager for the Client (NEC4 ECC Option B)
Client-side risk and funding approval (UK, NEC4)
Work as the Client's Project Manager on a new health centre: register the risks NEC4 leaves with the Client, fund them at P80 with a board reserve, price what a late opening costs the Partnership.
Advanced1.5 h of studyFigures checked 10EN
Task 1 free, then €39Professional certificate

Your roleQuantity surveyor and contract administrator
Remeasure, claim and get paid (Australia, AS 4000)
Stage 2 of a community health centre under AS 4000-1997 with a priced bill of quantities.
Intermediate2.5 h of studyFigures checked 26EN
Tasks 1–2 free, then €79Professional certificate

Your roleProject accountant and contract administrator
Get paid under a CCDC 2 contract (Canada)
Phase 2 of a co-operative seniors' residence under a CCDC 2 stipulated price contract.
Intermediate2 h of studyFigures checked 18EN
Task 1 free, then €39Professional certificate

WIP schedule: percent complete and over/under billing (US)
On an invented job: a three-storey building with shops below and apartments above.
Intermediate2 h of studyFigures checked 15EN
Task 1 free, then €39Professional certificate
Your roleClaims and Contracts ManagerClaims and extension of time (Saudi Arabia, FIDIC)
You are the Contractor's claims manager.
Advanced2 h of studyFigures checked 12EN
Task 1 free, then €59Professional certificate
Your roleThe employer's quantity surveyorPayment certificates and variations (South Africa, JBCC)
Intermediate course, five tasks, on an invented JBCC contract: a single-storey community clinic.
Intermediate3 h of studyFigures checked 12EN
Task 1 free, then €59Professional certificate

AI-drafted progress claims, verified (France)
Lot 04 steel frame, roofing and cladding of a sports hall, a French public works contract at unit prices under CCAG-Travaux 2021.
Intermediate3.5 h of studyFigures checked 9FR
Tasks 1–2 free, then €79Professional certificate

Your roleProject controls engineer at the CM at risk
Earned value: is the GMP still safe? (US)
On an invented US job: a five-storey patient tower built by a construction manager at risk under a guaranteed maximum price (GMP).
Advanced1.5 h of studyFigures checked 11EN
Task 1 free, then €39Professional certificate
Plan, build and assure 3

Your roleContractor's planner
Programme and critical path (UK)
Build the construction programme for a health centre in the Schedule module: durations from quantities and outputs, logic with a curing lag, the CPM critical path and float.
Intermediate2.5 h of studyFigures checked 16EN
Task 1 free, then €59Professional certificate

CPM schedule and time extensions (US, AIA A201)
You are the general contractor's project scheduler, the person who plans when each piece of work happens.
Intermediate3 h of studyFigures checked 19EN
Task 1 free, then €39Professional certificate
Your roleContractor's plannerAI-generated programme, verified (Brazil)
A municipal school extension, a public works contract at unit prices under Lei 14.133/2021.
Intermediate3.5 h of studyFigures checked 19PT
Tasks 1–2 free, then €79Professional certificate
Information, BIM and sustainability 1

Your roleBIM coordinator
IDS 1.0 and BCF 3.0: check model data and manage issues
Write a buildingSMART IDS 1.0 file for door fire ratings and import it, evaluate it on the model's doors (exact values, property sets, data types, cardinality).
Advanced2.5 h of studyFigures checked 7EN
Task 1 free, then €59Professional certificate
No course matches these filters.
Join the waitlist
What's included
- 36 professional courses on one building, 184 checked tasks
- A professional certificate for each course and 4 track certificates
- The full tender set: drawings with revisions and a model
- The first task of every course is free now
Each course shows its price. We email you when sales open.






















































